Case Study: Upgrading Fire Safety Across a Multi-Bay Warehouse
SAMPLE case study outline — how a phased fire safety upgrade across extinguisher coverage, signage and staff training closed compliance gaps at a Gujarat warehouse facility.
Note: this is a placeholder case study structure. Replace the details below with a real project once client sign-off is available for publication.
The site
A multi-bay warehouse and distribution facility in Gujarat, running two shifts with mixed racking, loading-bay and office areas — a common layout where extinguisher coverage and signage tend to lag behind the building's actual footprint as storage areas expand.
The gaps found
A fire risk assessment identified under-coverage in the newer racking bays, faded and non-compliant exit signage, and no recent staff training record on file.
The response
Extinguisher coverage was brought up to IS 2190 spacing requirements across all bays, exit and equipment signage was replaced with photoluminescent signage meeting ISO 7010 pictograms, and a full staff training session was run covering extinguisher handling and evacuation procedure.
The outcome
SAMPLE outcome — replace with a real, client-approved result (e.g. compliance status achieved, audit result, or client quote) once available.
Facing a similar gap between your building's footprint and its fire safety coverage? Get in touch for a site assessment.
